FREE

TAKEOFFS

Standard turnaround time for takeoffs is 7–14 business days and is processed on a first-come, firstserved basis. If this form is not received at the time of submittal, your project will be placed at the end of the queue until all required information is provided. For panel takeoffs, horizontal and vertical breaks must be designated (Panel Schedule). You will be notified if this information is missing.

Takeoffs are processed PER ORDER. If your project is subject to design changes, please wait to submit until plans are finalized, as returns are not accepted All project information must be FINALIZED prior to submission. This is not a preliminary design service, and Tamlyn does not provide project design.

PLEASE SEND ALL SUBMITTAL FORMS TO TAKEOFFS@TAMLYN.COM.
Pricing is not included with the takeoff and must be requested separately. If you have an account with us please follow up with Sales@Tamlyn.com. If you do not have an account with us, orders must be placed through your preferred lumber yard or distribution partner. You can find local retailers with our website finder.

Free Estimate
First
Last

Maximum file size: 516MB

Is a scaled PDF of the most recent architectural plans included?
Is Water Management Required?

Tamlyn Information:

Corporate Headquarters / Plant

Address: 13623 Pike Road, Stafford, TX 77477
USA Toll Free: 800-334-1676
Phone: 281-499-9604
Fax: 281-499-8948

Dallas Plant

Address: 10940 Petal Street, Dallas, TX 75238
USA Toll Free: 888-416-9676